Schedule of Wharfage & Storage Charges
For more detailed information, please refer to the St. Lawrence Seaway Schedule of Wharfage & Storage Charges or send your request to tariff@seaway.ca.
2023 Schedule of Wharfage & Storage Charges
(in Canadian dollars per metric tonne)
Top Wharfage
1. Goods loaded, unloaded or transhipped at a canal |
a) Bulk cargo;
for domestic general cargo, the general cargo weight or measure rule applies but with the bulk rate. |
$0.4569 per tonne; |
b) General cargo; when calculated on a measurement basis, fees shall never exceed two and a half (2.5) times what they would have been on a weight basis. |
$1.0442 per tonne or cubic meter (m3), whichever is greater |
c) Containerized cargo |
$0.4569 per tonne |
Storage Charge
2. Goods stored at a Canal on land other than land leased by the Manager to any person |
a) First 24 hours |
No charge |
b) Each period of 7 days or part thereof after first 24 hours |
$0.6136 per square metre of area occupied for storage (minimum tolls $59.7168 per period) |
Side Wharfage
3. A ship berthed in a canal, involved in commercial activities (cargo loading / unloading or lying in wait) |
a) First 6 hours or part thereof |
$0.0294 per gross registered ton (minimum tolls $59.7168) |
b) Each subsequent period of 6 hours or part thereof |
$0.0294 per gross registered ton (minimum tolls $17.9192 per period) |
Passenger Ship Wharfage
4. A passenger ship berthed at a canal or area that has been set aside by the Manager for that purpose |
a) First 6 hours or part thereof |
$0.0883 per gross registered ton (minimum tolls $179.1504) |
b) Each subsequent period of 6 hours or part thereof |
$0.0883 per gross registered ton (minimum tolls $53.7472 per period) |
Laying-up Charge
5. A ship lying-up at a canal or area that has been set aside by the Manager for that purpose |
a) First 24 hours |
No charge |
b) Each period of 10 days or part thereof during the navigation season after the first 24 hours |
$0.1367 per gross registered ton (minimum tolls $59.7168 per period) |
Passenger Wharfage
6. A charge per passenger embarking or disembarking at a canal or area that has been set aside by the Manager for that purpose |
$8.3200 per passenger |
Winter Berthing
7. A ship lying-up at a canal or area for the whole part of the season during which navigation is closed |
$0.3940 per linear metre per day |