Notices

#1: Walk-through Lockages At Iroquois Lock

March 18, 2010

#6 – Approach Wall Below Lock 2

March 17, 2010

#5 – Holding Position – ‘Head Of The Lock’

March 17, 2010

#4 – “Lockage Of The Future”

March 17, 2010

#3 – Mooring Certain Vessels in Lock Chambers Using Less than 4 Mooring Wires

March 17, 2010

#2 – Two-Person Lockage Procedures at Lock 8

March 17, 2010

#1 – General Instructions

March 17, 2010

#7 – Survey of Shipmasters

March 11, 2010

#6 – 96-Hour Pre-Entry Notification Required from Foreign Flagged Vessels

March 11, 2010

#5 – Mooring and Casting off In Locks

March 11, 2010

#4 – Communications

March 11, 2010

#3 – Tie-Up Service at Lock Approach Walls

March 11, 2010

#2 – Maximum Allowable Drafts ( Montreal Lake Ontario Section)

March 11, 2010

#1 – Opening of the 2010 Navigation Season and Maximum Allowable Drafts

February 16, 2010

#8 – Closing of the 2009 Navigation Season

November 16, 2009

#20: Marine Security Exercise

October 15, 2009

#10 – Update on Lock of the Future Testing – Lateral Hydraulic Assist – Revised

October 1, 2009

#19: Lateral Hydraulic Assist

October 1, 2009

#18: Dredging in the South Shore Canal, Above Lock 2 and Below Lock 3, on Lake St-louis

September 10, 2009

#17: Modification to Phase III of the Trial on Stopping and Positioning of the Vessel at Lock 3

September 8, 2009

#16: Installation of a Sector Light on the Upper Beauharnois Front Range

September 4, 2009

#15: Dredging Operations U.S. Waters

September 3, 2009

#9 – Update on Lock of the Future Testing – Lateral Hydraulic Assist

August 26, 2009

#8 – Update on Lock of the Future Testing

July 17, 2009

#14: Update on Lock of the Future Testing

July 17, 2009

#13: Walk – Through Lockages at Iroquois Lock

July 17, 2009

#12: Lifting of Gates N° 7 & 8 – Upper Saint-Lambert Lock

June 29, 2009

#11: Celebration of the Seaway’s 50th Anniversary

June 26, 2009

#10: Update on Lock of the Future Testing

June 17, 2009

#7 – Update on Lock of the Future Testing

June 17, 2009