Notices
#21: Solar Powered Lights
October 24, 2007
#7 – Self Spotting — Testing in Lock 8
October 23, 2007
#20: Restrictions Modified – Lake St. Louis
October 17, 2007
#19: Water Levels on Lake St-louis
October 17, 2007
#17: Restrictions – Lake St. Louis
October 10, 2007
#16: Iroquois Dam Operation
October 1, 2007
#15: Walk-through Lockages at Iroquois Lock
September 13, 2007
#8 – Maximum Permissible Draft — Montreal to Lake Ontario
August 24, 2007
#14: Dredging in Reach of South Shore Canal
August 22, 2007
#11: Low Water Levels Above Cote St. Catherine Lock
August 13, 2007
#10: Repairs at the St-louis de Gonzague Bridge – Cell #2
August 3, 2007
#2: Security at Approach / Tie-up Walls
March 22, 2007
#1: Eisenhower and Snell Locks
March 20, 2007
#4 – Testing of Hands Free Mooring Equipment in Lock 8
March 20, 2007