Notices to Shipping – Welland Canal
#2 – Holding Position – ‘Head of the Lock’
March 27, 2012
#1 – General Instructions
March 27, 2012
#16 – Conclusion of Hands Free Mooring (HFM) Testing at Lock 7
December 22, 2011
#15 – Lock 2 Upper Tie Up Wall
December 2, 2011
#12 – Resumption of Hands Free Mooring (HFM) Testing at Lock 7
September 2, 2011
#11 – Upper West Wall above Lock 7 – New Checkerboard Positioning Sign
September 2, 2011
#4 – Holding Position – ‘Head of the Lock’
March 23, 2011
#3 – “Lockage of the Future”
March 23, 2011
#2 – Vessel Meets Below Lock Four and Above Lock Six
March 9, 2011
#1 – General Instructions
March 9, 2011
#7 – Approach Wall Below Lock 2 – Now Back in Service
April 8, 2010
#6 – Approach Wall Below Lock 2
March 17, 2010
#5 – Holding Position – ‘Head Of The Lock’
March 17, 2010
#4 – “Lockage Of The Future”
March 17, 2010
#2 – Two-Person Lockage Procedures at Lock 8
March 17, 2010
#1 – General Instructions
March 17, 2010
#8 – Update on Lock of the Future Testing
July 17, 2009
#7 – Update on Lock of the Future Testing
June 17, 2009