Notices

#30: Work at the Upper and Lower Approach Walls at St-Lambert Lock

October 11, 2013

#29: Work at the Upper Approach Wall at Cote Ste-Catherine Lock

October 11, 2013

#28: Caution – Low Water Levels on Lake St. Louis (Cancelled)

October 7, 2013

#27: Restrictions – Lake St. Louis Water Levels (Cancelled)

October 7, 2013

#15 – Wharf 2, 16, and 18.2

September 16, 2013

#26: Water Levels on Lake St-Louis (Revised) (Cancelled 2013/11/22)

September 10, 2013

#25: Water Levels on Lake St-Louis (Cancelled)

September 3, 2013

#14 – West Flight Locks are Back in Service

August 28, 2013

#24: Water Levels on Lake St-Louis (Cancelled 2013/11/22)

August 28, 2013

#23: Section of fendering missing at the Côte Sainte-Catherine upper approach wall

August 27, 2013

#13 – West Flight Locks are out of Service until Further Notice

August 26, 2013

#12 – Lock 6 West

August 23, 2013

#22: Water Levels on Lake St. Lawrence

August 22, 2013

#21: Bass Masters Elite Series Tournament

August 1, 2013

#20: Vehicle controls at the Maisonneuve Region locks

July 23, 2013

#19: Wearing of identification cards at the Maisonneuve Region locks

July 22, 2013

#18: Replacement of N° 3 Ship Arrester at the St-Lambert Lock

July 3, 2013

#17: Fireworks Close to the Iroquois (Ontario) Lock

June 21, 2013

#16: Fireworks at la Ronde – Port of Montreal

June 17, 2013

#15: Shoaling at Cross Over Island (Revised) – (Cancelled)

May 20, 2013

#14: New Variable Message Panel for Pleasure Crafts at Valleyfield Bridge

May 13, 2013

#13: High Water Levels on Lake St. Lawrence

May 13, 2013

#12: Shoaling at Cross Over Island (Cancelled)

May 10, 2013

#11: Shoaling at Galop Island (Revised)

May 8, 2013

#10: Control of animal population in the vicinity of buoy C-10 below Saint-Louis-de-Gonzague Bridge in the Beauharnois canal (high tension lines)

April 18, 2013

#9: Repair Work at Jacques-Cartier Bridge

April 18, 2013

#11 – Wharf 12 Out of Service

April 16, 2013

#8: Reduced Operating Speed of the 7B Canadian Pacific Bridge at Kahnawake

April 9, 2013

#7: Suspension of Interfaces (deliveries, embarking/disembarking and visits to ships) at Beauharnois Lock N° 4

April 2, 2013

#6: Replacement of No 4 Ship Arrester at the St-Lambert Lock

March 25, 2013