Notices
2020 – #12 Lock 8 Ship Crew Changes
June 23, 2020
2020 – #11 Wharf 12 South – Ship Interface
June 22, 2020
2020 – #26 Critical Areas during High Flows – Revised
June 16, 2020
2020 – #3: Pleasure Craft Lockages in the Welland Canal
June 11, 2020
2020 – #3: Pleasure Craft Lockages at Iroquois Lock
June 5, 2020
2020 – #19 Restriction on Passenger Vessels
June 1, 2020
2020 – #25 Information on Outflows – Revised
May 29, 2020
2020 – #23 Wake Monitoring (Cancelled 2020/10/13)
April 28, 2020
2020 – #22 Transfer of LPA Pilots at St. Lambert Lock
April 23, 2020
2020 – #20 Removal of Tug at Iroquois Lock
April 7, 2020
2020 – #19 Modifications to Ship Inspections – Revised
April 3, 2020
2020 – #8 Radio Communications With Locks
April 1, 2020
2020 – #12 SLSMC Security Monitoring
April 1, 2020