Notices

2025 – #11 Scheduled Outage at Bridge 5

May 2, 2025

2025 – #2: On-Line Reservation System Availability

May 2, 2025

2025 – #8 Linehandler Training at GLS Locks

April 28, 2025

2025 – #10 Bridge 5 Work (Cancelled 2025/05/09)

April 25, 2025

2025 – #7 Linehandler Training at MLO

April 25, 2025

2025 – #2: On-Line Reservation System Availability

April 24, 2025

2025 – #9 Niagara Phone Service Restored

April 17, 2025

2025 – #1: Pleasure Craft Lockage Season in the Welland Canal

April 17, 2025

2025 – #1: Pleasure Craft Lockage Season at the MLO Canadian Locks

April 17, 2025

2025 – #8 Niagara Phone Line Out of Service

April 16, 2025

2025 – #6 Bridge Raising Sequence for Downbound Ships at St. Lambert Lock

April 10, 2025

2025 – #10 Anchor Marking Buoys

April 9, 2025

2025 – #7 Wharf 17 Out of Service

April 1, 2025

2025 – #5 Operations of Bridges 7A & 7B – Revision #1

March 27, 2025

2025 – #9 Foreign Ship Inspection Program

March 21, 2025

2025 – #4 Speed Restrictions – MLO Section (Revised 2025/08/08)

March 19, 2025

2025 – #8 Maximum Permissible Draft – Montreal to Lake Ontario

March 18, 2025

2025 – #6 Gates 1 & 2 Removed at Lock 6 East

March 13, 2025

2025 – #5 West Flight Locks Out of Service

March 13, 2025

2025 – #4 Shallow Depths and Associated Restrictions in the Welland Canal

March 13, 2025

2025 – #3 Personnel Interfaces with Ships at the Locks in the Welland Canal

March 13, 2025

2025 – #2 Ship Chandler Interfaces with Ships at the Wharves in the Welland Canal

March 13, 2025

2025 – #1 General Instructions

March 13, 2025

2025 – #7 Wind Assisted Propulsion System

March 13, 2025

2025 – #6 Ships at Wharves in the Seaway

March 13, 2025

2025 – #5 Passing Entries

March 13, 2025

2025 – #4 Draft Information System Audits and Requirements

March 13, 2025

2025 – #3 General Notice

March 13, 2025

2025 – #3 Operations of Bridges 7A & 7B (Revised 2025/03/27)

March 13, 2025

2025 – #2 Interfaces with Ships at Canadian Locks Under MARSEC 1

March 13, 2025