#12: Bridge 7 Operation at Kahnawake

May 6, 2014

#11: Lifting for Installation of Gates No 7 & 8 at St-Lambert Lock

May 5, 2014

#9 – Vessel Gangways Near HFM Abutments – Lock 3

April 30, 2014

#10: Water Levels on Lake St. Lawrence

April 25, 2014

Saint Lawrence Seaway Announces New Scheduled International Cargo Shipping Service Begins at the Port of Cleveland

April 22, 2014

Saint Lawrence Seaway Development Corporation Announces Pacesetter Award Winners for 2013 Navigation Season

April 18, 2014

#9: AMT Commuter Trains ETA for Bridges 7A&7B

April 17, 2014

#10 – Transit Restrictions at Opening (Draft and Power to Length Ratio)

April 14, 2014

#9 – Maximum Allowable Drafts – Montreal Lake Ontario Section

April 14, 2014

#8: High Water Levels on Lake St. Lawrence

April 14, 2014

#7: Certain Dangerous Cargo

April 4, 2014

#8 – Wharf 2, 16, 18.2

April 3, 2014

#6: Hands Free Mooring System at Upper Beauharnois Lock

March 28, 2014

March 28, 2014: Seaway Opens 56th Navigation Season

March 28, 2014

#5: High Spots – U.S. Sector IV (Cancelled)

March 26, 2014

#7 – Vessel Self-Spotting Radio – Lock 3

March 26, 2014

#6 – Upper Tie Up Wall Above Lock 2

March 26, 2014

#4: Shoaling at Galop Island (Cancelled)

March 26, 2014

#5 – Upbound Vessel Mooring – Change in Tie Up Procedure

March 26, 2014

#4 – Mooring Vessels in Locks with Length up to 200 Meters Using Soft Lines

March 26, 2014

#3 – Vessels Only Permitted to Use Radar Set on a Short Range of Three Nautical Miles or Less when Transiting the Welland Canal

March 26, 2014

#2 – Wharf 18.2 and Wharf 18.3

March 26, 2014

#1 – General Instructions

March 26, 2014

#8 – Opening of the 2014 Navigation Season and Maximum Allowable Drafts – Revised for Montreal / Lake Ontario Section

March 17, 2014

#7 – Tie-Up Service at Lock Approach Walls

March 11, 2014

#6 – Testing the Use of Soft Lines for Mooring in Locks for Ships not Greater than 200 Meters in Overall Length

March 11, 2014

#5 – General Notice

March 11, 2014

#4 – Communications

March 11, 2014

#3 – Mooring and Casting off In Locks

March 11, 2014

#2 – Transit Restrictions at Opening (Draft and Power to Length Ratio) – (Cancelled 2014/04/14)

March 10, 2014