#18: Maintenance / Repair Work at Eisenhower Lock

August 20, 2012

#17: Green Light on the Bank of the South Shore Canal below St-Lambert Lock (Correction to Shipping Notice # 16)

July 26, 2012

#16: Green Light on the Bank of the South Shore Canal below St-Lambert Lock

July 19, 2012

#15: Low Water Levels below St. Lambert Lock

July 17, 2012

U.S. Seaway Corporation Announces New Vessel Safety Technology

July 11, 2012

#14: Repair Work at Jacques-Cartier Bridge

July 11, 2012

#13: Meeting above Cote Ste-Catherine Lock

June 29, 2012

#12: Fireworks Close to the Iroquois (Ontario) Lock

June 26, 2012

#11: Fireworks at la Ronde – Port of Montreal

June 26, 2012

#10 – Maximum Permissible Draft – Montreal to Lake Ontario

June 19, 2012

#10: Low Water Levels above Cote St. Catherine Lock

June 19, 2012

#9: Water Levels on Lake St-Louis

June 1, 2012

#8: Restrictions – Lake St. Louis Water Levels

June 1, 2012

#7: Highway 30 Bridge over Seaway Channel

May 29, 2012

The St. Lawrence Seaway Management Corporation: Notice of Special Examination Report

May 26, 2012

Dwight D. Eisenhower Visitors’ Center to Open for Season

May 24, 2012

#6: Water Levels on Lake St-Louis

May 23, 2012

#9 – Vessels Transits with Draft Information System

May 8, 2012

Seaway Corporation Maintains Exceptional Safety Record for Asset Renewal Winter Work

April 25, 2012

La Corporation de la Voie maritime maintient un dossier exceptionnel en matière de sécurité dans les travaux hivernaux de renouvellement des actifs

April 25, 2012

Service Interruption

April 24, 2012

#10 – Lock 6 West – Final Mooring Position

April 19, 2012

#5: Vessel Self Spotting Radio System at Cote St. Catherine Lock

April 17, 2012

#9 – Wharf 18.2 and Wharf 18.3

April 12, 2012

Port of Green Bay Earns Seaway Pacesetter Award for Increase in International Tonnage

April 2, 2012

Cleveland-Cuyahoga County Port Authority Earns Seaway Pacesetter Award for Increase in International Tonnage

March 28, 2012

#8 – Vessel Personnel Safety When Working Around Hands Free Mooring (HFM) Equipment at Lock 7

March 27, 2012

#7 – Hands Free Mooring (HFM) Testing at Lock 7 – 2012

March 27, 2012

#6 – Mooring Vessels in Locks with Length up to 150 Meters Using Soft Lines

March 27, 2012

#5 – Lock 2 Upper Tie Up Wall

March 27, 2012