#9 – Approach Wall Below Lock 2

March 22, 2011

Seaway Opens 53rd Navigation Season Projecting 7% Increase for 2011

March 22, 2011

Draught Information System

March 16, 2011

#1: Security at Approach / Tie-up Walls

March 15, 2011

#6 – General Notice

March 11, 2011

#5 – Pre Entry Notice of Arrival Required from Foreign Flagged Vessels

March 11, 2011

#4 – Mooring and Casting off In Locks

March 11, 2011

#3 – Communications

March 11, 2011

#2 – Tie-Up Service at Lock Approach Walls

March 11, 2011

#2 – Vessel Meets Below Lock Four and Above Lock Six

March 9, 2011

#1 – General Instructions

March 9, 2011

#1 – Opening of the 2011 Navigation Season and Maximum Allowable Drafts

February 16, 2011

Deeper Discounts on Seaway Tolls with Service Incentive

February 14, 2011

St. Lawrence Seaway Welcomes Three New Directors

February 4, 2011

No Toll Increase for Seaway in 2011

January 14, 2011

Seaway Tonnage Rebounds In 2010

January 13, 2011

Grain Export Shipping on Upswing in Great Lakes St. Lawrence Seaway Ports

November 19, 2010

#12 – Closing of the 2010 Navigation Season

November 16, 2010

#32: Replacement of the Emergency Wharf at CPR Bridge – South Shore Canal

November 16, 2010

#31: Work at the Jacques-Cartier Bridge Support Protection Walls in the South Shore Canal

November 16, 2010

#30: Anchor Moved Out of Main Channel on Lake St-Francis Below St-Zotique Anchorage

November 11, 2010

#29: Revised – Vessel Self Spotting Systems – Canadian Deep Locks from Montreal to Lake Ontario

November 10, 2010

#28: Vessel Self Spotting Systems – Canadian Deep Locks From Montreal To Lake Ontario

October 28, 2010

#27: Anchor Lost in Main Channel on Lake St-Francis Below St-Zotique Anchorage

October 21, 2010

#10 – Vessel Personnel Safety When Working Around Hands Free Mooring (HFM) Equipment at Lock 7

October 12, 2010

#11 – AIS Water Level Data Transmission

October 5, 2010

#26: Water Levels In South Shore Canal Reach

September 30, 2010

#25: Work on Ship Arrester N° 3 at the St-Lambert Lock

September 16, 2010

#24: Work on Cell Lighting for St. Louis De Gonzague and Valleyfield Bridges (Bridges 9 & 10)

September 8, 2010

#23: Dredging Operations – U.S. Waters

September 3, 2010