#2 – Two-Person Lockage Procedures at Lock 8
March 17, 2010
#1 – General Instructions
March 17, 2010
#7 – Survey of Shipmasters
March 11, 2010
#5 – Mooring and Casting off In Locks
March 11, 2010
#4 – Communications
March 11, 2010
#3 – Tie-Up Service at Lock Approach Walls
March 11, 2010
#1 – Opening of the 2010 Navigation Season and Maximum Allowable Drafts
February 16, 2010
Seaway Concludes 50th Anniversary Season
January 8, 2010
#8 – Closing of the 2009 Navigation Season
November 16, 2009
#20: Marine Security Exercise
October 15, 2009
#19: Lateral Hydraulic Assist
October 1, 2009
#16: Installation of a Sector Light on the Upper Beauharnois Front Range
September 4, 2009
#15: Dredging Operations U.S. Waters
September 3, 2009
#8 – Update on Lock of the Future Testing
July 17, 2009
#14: Update on Lock of the Future Testing
July 17, 2009
#13: Walk – Through Lockages at Iroquois Lock
July 17, 2009
Seaway Committed to Sustainable Shipping Practices
July 3, 2009
#11: Celebration of the Seaway’s 50th Anniversary
June 26, 2009
#10: Update on Lock of the Future Testing
June 17, 2009
#7 – Update on Lock of the Future Testing
June 17, 2009
#9: Fireworks at La Ronde – Port of Montreal
June 12, 2009
#6 – Extreme North End of the Approach Wall Below Lock 2
April 21, 2009