Notices to Shipping – Montreal/Lake Ontario

#1: Final Mooring Position Tolerances for Full Sized Vessels Using HFM

March 19, 2018

#33: High Spots at Galop Island – Revised

December 18, 2017

#32: Linehandler training at MLO locks – Revised

December 8, 2017

#31: Linehandler training at MLO locks (Cancelled 2017/12/08)

November 29, 2017

#30: Meets allowed below Beauharnois Lock 3

October 2, 2017

#29: High Spots at Galop Island (Cancelled 2017/12/18)

September 29, 2017

#28: Vessel Speed Restriction Iroquois Lock to Tibbetts Point – Cancelled

September 12, 2017

#27: Vessel Speed Restriction Due to High Water Levels – Revised (Cancelled 2017/09/12)

August 11, 2017

#26: Communication for Upbound Vessels – cancelled

July 27, 2017

#25: Vessel Speed Restriction in Brockville Narrows cancelled

July 24, 2017

#24: Possible Delays at Iroquois Lock – July 20-23, 2017

July 14, 2017

#23: High Spots – U.S. Sector IV

July 12, 2017

#22: High Spots at Galop Island (Cancelled 2017/09/29)

July 12, 2017

#21: Fireworks at La Ronde – Port of Montreal

June 29, 2017

#20: Possible Delays at Côte Ste. Catherine Lock – July 2, 2017

June 29, 2017

#19: Stronger Currents near Cardinal and Canada Island

June 20, 2017

#18: Revised High Water Level Procedure at Iroquois Lock – Cancelled

June 20, 2017

#17: Communication for Upbound Vessels (Cancelled 2017/07/27)

June 20, 2017

#16: No Meets below Beauharnois Lock 3 (Cancelled 2017/10/02)

June 14, 2017

#15: Vessel Speed Restriction – Brockville Narrows to Prescott (Cancelled 2017/07/24)

May 15, 2017

#14: Vessel Speed Restriction Due to High Water Levels – Revised (Cancelled 2017/08/11)

May 8, 2017

#13: High Water Levels at Iroquois Lock

May 3, 2017

#12: Vessel Speed Restriction Due to High Water Levels (Cancelled 2017/05/08)

May 2, 2017

#11: Vessel Speed at Bridges 7A & 7B

May 1, 2017

#10: Revised High Water Level Procedure at Iroquois Lock (Cancelled 2017/06/20)

April 24, 2017

#9: Operation of Bridges 7A & 7B – Revised Train Schedule

April 7, 2017

#8: Temporary Speed Reduction Near Galop Island

March 17, 2017

#7: Speed Limit Modification on Lake St. Francis

March 10, 2017

#6: Operation of Bridges 7A & 7B (Cancelled 2017/04/07)

March 10, 2017

#5: Reminder – Speed Reduction at the Port of Valleyfield

March 10, 2017